Buying guide · 5 min read
An AI pilot that ends in a decision
The short answer
How do you run an AI pilot that ends in a decision?
Write the decision into the pilot before it starts: one workflow, one owner, a measured baseline, an evaluation set, a fixed end date, and agreed thresholds for go, fix, or stop. Run the AI beside the current process on real work, compare the two item by item, and hold one decision meeting on the end date.
Updated October 9, 2026 · Vendor-neutral: we take no fees from any vendor
Many AI pilots stall without a clear end. The demo works, a few people like it, the end date passes, and nobody decides. Deloitte's 2026 survey found that only 25% of organizations have moved 40% or more of their AI pilots into production. Gartner's 2024 survey put the share of AI projects that reach production at 48%, with eight months on average from prototype to production.
A pilot that ends in a decision is designed differently from the first day. This guide brings together the practices in our playbook into one sequence you can follow.
1. Pick one workflow with an owner
Start with a workflow, not a tool. The workflow should have a named owner, a known volume, and a known cost. Those three facts let you size the value and know when you are done. "Try Copilot in finance" is too vague to test. "Cut the time to close supplier invoice exceptions" gives you something to measure. See start with a workflow, not a tool.
The owner is the person who will make the go, fix, or stop decision. Name them in writing. If nobody will take the decision, the pilot is not ready.
2. Measure the baseline first
Before anything changes, measure how the workflow performs today: time per item, cost per item, error or rework rate, and volume. Two to four weeks of data is usually enough. Use system data where you can and a simple tally where you cannot. See set the baseline before you build.
Without a baseline, the pilot ends with "it seems faster." That sentence has never won a budget.
3. Build the evaluation set
Collect real past examples with known correct answers: 50 to 200 is a practical range for most workflows. Include the hard and unusual cases, not only the clean ones. This set is the fixed test that every version of the system must pass, before launch and after every change. See build the evaluation set first.
4. Decide where the person stays
Go through the workflow step by step. For each step, decide whether the AI acts alone, drafts for a person to review, or gathers information for a person to decide. Steps that are hard to undo or hard to check stay with a person, and that person has a name. See decide where the person stays.
This step also tells staff what their role will be. People engage with a pilot far more when they know where their judgment still counts.
5. Write the charter, including the decision
Put everything on one page, including what result means go, what means fix, and what means stop. Agree on it with the owner before the pilot starts. Changing thresholds after you see results is how pilots turn into opinions.
| Charter line | Example (made up) |
|---|---|
| Workflow | Supplier invoice exceptions in accounts payable |
| Owner who decides | Accounts payable lead |
| Baseline | 7 days average to close an exception; 4% of closures reopened |
| Target | 2 days average; reopened rate no higher than today |
| Evaluation set | 80 past exceptions with known correct outcomes |
| Where the person stays | A clerk approves every change to a payment |
| Run mode | Parallel run on live items; the team's result stays official |
| Go if | Target met and 90% or more of drafts match the correct outcome |
| Fix if | Match rate 75% to 89%, or one cause explains most misses |
| Stop if | Match rate under 75%, or any data or control breach |
| End date | Six weeks from start; decision meeting booked now |
6. Run it beside the current process
Run the AI on the same live items the team handles each day, while the team's output stays the official result. Compare the two outputs item by item: match, better, or worse. Review the "worse" cases each week and fix the cause. See run the pilot beside the current process.
A parallel run gives you a fair comparison at real volume, with no risk to customers. It also builds trust: the team sees the system handle their own cases.
7. Train the pilot users on their real work
The people in the pilot need more than a login. Give them a short session, by role, on their own tasks: what to check, when to override, how to report a bad result. Track use each week. If use drops, find out why before the end date. See train on real work, by role.
8. Hold one decision meeting
On the end date, hold one meeting with the owner and a one-page results summary: baseline, result, match rate, the worst cases, cost to run, and the recommendation. The owner chooses:
- Go: name the production owner, the date, and the controls that carry over.
- Fix: name the cause, the change, and a short re-test with a new end date.
- Stop: record what you learned and release the team.
See end every pilot with go, fix, or stop.
What goes on the one-page results summary
Keep the summary to one page, so the decision meeting discusses results and not formatting. It should show:
- the baseline and the result for each measure in the charter, side by side;
- the match rate on the evaluation set, at the start and at the end;
- the five worst cases, with the cause of each and whether it is fixed;
- what the pilot cost, and what it would cost to run at full volume;
- weekly use by the pilot group, and what users said;
- any data, security, or control issue, however small;
- the recommendation, and who made it.
If the numbers and the recommendation disagree, say so on the page. A summary that hides a weak result to protect the project makes the next pilot harder to fund.
How long should it take?
For a single workflow, plan four to eight weeks of running time after the baseline and evaluation set are ready. Shorter runs rarely see enough real items. Much longer runs usually mean the scope grew or the thresholds were never agreed. Our answer on how long an AI pilot takes covers what moves the timeline.
Signs your pilot will drift
- No named owner, or an owner who says "the team will decide."
- No baseline, or a baseline you plan to "estimate later."
- A demo set chosen by the vendor in place of your own evaluation set.
- Success defined as "users like it."
- No date in anyone's calendar for the decision meeting.
Any one of these is fixable in a day before the pilot starts. After it starts, each one costs weeks.
Where we fit
In our 23-day action plan, the first initiatives leave with a charter, an owner, a baseline, and a budget, so a pilot can start on day 24. Our agentic workflow design work then runs the pilot with your team through to the decision.
Common questions
What is the difference between an AI proof of concept and a pilot?
A proof of concept shows that something can work, usually on sample data. A pilot shows whether it works in your real workflow, with real items, real users, and real controls, and it ends in a decision to go, fix, or stop.
What success criteria should an AI pilot have?
At least one value measure against a baseline, such as time, cost, or error rate, and one quality measure, such as the match rate on your evaluation set. Agree on the thresholds for go, fix, and stop before the pilot starts.
Is it a failure if an AI pilot ends in stop?
No. A pilot that stops on time, with a written lesson, has done its job at a known cost. The failure is a pilot that runs on for months with no decision.