How long does an AI pilot take?

The short answer

How long does an AI pilot take?

A well-scoped AI pilot on one workflow usually runs four to eight weeks of live use, after two to four weeks to measure a baseline and build a test set. Moving from a successful pilot to full production takes longer; Gartner's 2024 survey found an average of eight months from prototype to production.

Updated October 9, 2026

A typical AI pilot on one workflow runs four to eight weeks of live use. Add two to four weeks before that to measure the current process and collect a set of real test cases, so plan on six to twelve weeks from start to decision.

Where the time goes

  • Setup, two to four weeks. Name the owner, measure the baseline, build the evaluation set, decide where people review the AI's work, and agree what result means go, fix, or stop.
  • Live running, four to eight weeks. Run the AI beside the current process on real items and compare the results each week. Fewer than four weeks rarely sees enough volume or enough unusual cases.
  • Decision, one meeting. The owner reviews a one-page summary and decides.

Published guides from firms that sell this work give similar ranges. Winder.AI's 2026 guide, for example, lists a fixed-fee pilot at six to ten weeks (Winder.AI, June 2026).

What makes pilots run long

  • No end date. A pilot without a date in the calendar drifts.
  • Scope creep. A second workflow joins halfway through.
  • Data access. Approvals for system access take weeks you did not plan for.
  • No threshold. Without an agreed result for go, every meeting ends with "let's run it a bit longer."

After a successful pilot, production takes longer again. Gartner's 2024 survey found that only 48% of AI projects reach production, and that the move from prototype to production takes eight months on average.

How Archer & Linc approaches it

We fix the timeline before the pilot starts. Under our 5/23 method, you get a diagnosis by day 5 and a plan ready to act on by day 23, with the first initiatives scoped: charter, owner, baseline, and budget. That means a pilot can start on day 24 with the setup work already done. Every pilot we design ends on a fixed date with a go, fix, or stop decision.

Read the full method in our guide on running an AI pilot that ends in a decision.

Common questions

Can an AI pilot take two weeks?

A proof of concept can, if it uses sample data and a simple tool. A pilot on live work rarely gives a reliable answer in two weeks, because it needs enough real items to compare against the baseline.

Why do AI pilots take longer than planned?

The usual causes are a scope that grows during the pilot, data that takes longer to reach than expected, and no agreed end date or success threshold.

What happens after an AI pilot?

The owner decides go, fix, or stop. Go leads to a production plan with an owner, controls, and a date. Fix leads to a short re-test. Stop releases the team and records what you learned.

Sources

  1. Gartner: only 48% of AI projects make it into production, and prototype to production takes 8 months on average (press release, May 7, 2024)
  2. Winder.AI: AI consulting costs in 2026 (June 24, 2026)

Ready for a plan in five days?

Tell us where the work hurts. We will tell you, plainly, whether AI is the right fix and what the first step looks like.