AI pilot charter
How do we run an AI pilot that ends in a decision?
A fill-in charter that sets the purpose, owner, baseline, success measure, end date, and decision rule before an AI pilot starts. At the end date, the decision owner records one result: go, fix, or stop.
Version 1.0, October 2026 · CC BY 4.0 · General guidance, not legal advice.
What is inside
- Sections for purpose, people, scope, and risk tier
- A baseline table to fill in before the build
- Success measures with a quality guardrail and an adoption target
- A go, fix, or stop decision rule agreed in advance
- A 6P quick check, a sign-off table, and a decision record for the end
Who it is for
Pilot owners, sponsors, and the leader who decides whether an AI pilot reaches production.
How to use it
- 01Fill in sections 1 to 7 with the pilot owner and the decision owner. Measure the baseline before any build starts.
- 02Agree on the decision rule table, then sign the charter with the sponsor.
- 03Run the pilot beside the current process. At the end date, complete the decision record in one meeting.
Preview
What the template says
What the charter records
- Purpose: the workflow, the problem in one sentence, and why AI suits it.
- People: pilot owner, decision owner (one person), sponsor, users, reviewer.
- Scope: in and out of scope, data used and its class, risk tier, tool.
- Baseline: primary measure, quality measure, and volume, with source and period.
- Success: primary target, quality guardrail, adoption target, cost limit.
- Dates: start, checkpoint, end (no more than 12 weeks), decision meeting.
The decision rule
| Decision | When | What happens next |
|---|---|---|
| Go | Primary target met, quality guardrail held, and users want to keep it. | Name the production owner and the go-live date. Complete the 6P go-live checklist. |
| Fix | At least half of the target gap closed, and a named, fixable cause for the rest. | One re-test only, with a new end date no more than six weeks out. |
| Stop | Target missed with no fixable cause, guardrail breached, or cost above value. | Record the lessons. Release the team and the budget. |
Decision record
Decision, date, results against the baseline, a link to the one-page results summary, what the team learned, and the next owner and date. The lessons line is required for every decision, including stop.
Download
Get the DOCX file
Free to use and adapt under CC BY 4.0, with credit to Archer & Linc. It is general guidance, not legal advice.
Questions
How long should an AI pilot run?
Long enough to collect a fair sample of real work, and no longer. For most workflows that is six to twelve weeks. The charter caps the end date at twelve weeks and allows one re-test.
Why agree on the decision rule before the pilot starts?
Once a team has built something, it wants to keep it. A rule agreed in advance keeps the decision honest and makes stop an acceptable, low-cost result.
What if we have no baseline data?
Measure it now, by hand if needed, over two to four weeks. A small, honest sample beats an estimate. Without a baseline, no pilot result can prove anything.